HOME    ABOUT US   SERVICES   PROJECTS   CONTACT US   PRIVACY POLICY

Contractor License #499392

© 2019 McGillivray Construction. All rights reserved.

 

MCG BID CENTER PROJECTS
CANALINO MODERNIZATION

Bid Due Date:  Thursday, February 14th, 2019 at 3:00PM

Project Type:  RENOVATION

Project Status:  Subcontractor Bidding

Prevailing Wage:  Yes 

Location:  1480 Linden Ave, Carpinteria, CA 93013

BID INVITATION

PROJECT DESCRIPTION: The projects consists of alterations to existing school buildings in order to remodel restrooms to current accessibility standards. Remodel food service areas, update mechanical systems, communication systems, lighting, door hardware and to replace floor finishes & other interior finishes. Includes alterations to existing wood framed structural systems in support of mechanical and other scope of work. Includes selective exterior paving replacement for accessible threshold conditions at existing doors.

The whole project is going to be done in five phases. The phasing plan and schedule can be found in the link to download plans. Breakdown your price per each phase separately on your quote.

 

ESTIMATED START: June 14, 2019

ESTIMATED END: December 10, 2020

 

This is a prevailing wage project.

 

The applicable trades: Abatement, Hard demo, soft demo, surveying, dry & wet utilities, asphalt, site concrete, structural concrete, steel, roof screen, finish carpentry, rough carpentry, cabinetry, countertops, roofing, sheet metal, doors and hardware, storefront, drywall & metal framing, FRP, gypsum plastering, tile, acoustical ceilings, vinyl tackable wall panels, markerboard insulation, flooring, epoxy flooring, Ardex floor prep, painting, toilet accessories, fire extinguishers, signage, wheel chair lift, kitchen equipment, HVAC, plumbing, low voltage, communication, visual display, electrical and Fire Alarm

 

INSURANCE: Bidders shall provide the following insurance minimums: Commercial General Liability Insurance products, completed operations, waiver of subrogation, protective coverage with non-owned & hired vehicles; $2 million each occurrence. Additional insured and hold harmless per endorsement CG 2010 form 1185 or equivalent, comprehensive automobile liability and Workman’s Compensation Insurance, including waiver of subrogation, for at least $1 mil each occurrence.  

 

Bonding: Performance and labor bonding may be required; costs will be added to your proposal

Click to Download Project Plans

ADDENDUM - NONE

Send Questions About Project to: Russell Trozera at russell@mcgillivrayconstruction.com


Email Proposals to: Adil Mohammad at adil@mcgillivrayconstruction.com


Or Fax Proposals to: 805.648.5875

CALL

805-648-1517

CONTACT

CONNECT

  • MCG_Social_Facebook.png
  • MCG_Social_LinkedIn.png
  • MCG_Social_Blog.png