Feb 16

Featuring: "Artisan Court Residential Facility"

ARTISAN COURT RESIDENTIAL FACILITY

Size: 41,000 SQ. Feet

Time Frame to complete: 12 months

Developer: City of Santa Barbara Housing Authority

Contact: Rob Pearson, Executive Director

Project Brief

City of Santa Barbara Housing Authority commissioned the construction of this residential facility.

Elements specific to the project

MCG was able to successfully mitigate the challenges of constructing this 3-story facility with podium deck parking. What made this project challenging was that the job site was surrounded on 3 sides by structures within close proximity to the property line and the street, resulting in no space for staging or laydown. This project was a LIHTC project and required construction to be completed within a very aggressive time frame. MCG was not only able to meet the contract completion date but delivered the project one month early.

Project highlights

  • Mitigated the problem of excavation and transportation of contaminated soil of the entire site, and rebuilt the site with clean dirt.
  • Instead of 4 months of delays, we quoted 2 months, yet we required only a 30 day extension to the contract completion date.
  • Built a parking structure on top of 3 story complex with over 125 driven concrete piles – ongoing 5 feet from the popular FM radio station in down town Santa Barbara without excessive noise.
  • Project received several awards for construction and architecture.
  • Combined the production techniques used in large housing developments in a urban setting.
  • Successfully helped the owner to keep the cost of changes of the project to a minimum and well below industry standards.

Presenting

Artisan Court Residential Facility Artisan Court Residential Facility Artisan Court Residential Facility Artisan Court Residential Facility  Artisan Court Residential Facility

Award winning Santa Barbara Housing Project. 41,000 square feet, 12 months to completion. See images of the project where large housing development techniques were used in an urban setting.

Add comment

  Country flag

biuquote
  • Comment
  • Preview
Loading

800-642-0751
Connect with MCG

Featuring: "Artisan Court Residential Facility"

Award winning Santa Barbara Housing Project. 41,000 square feet, 12 months to completion. See images of the project where large housing development techniques were used in an urban setting.

{KeyWord}

Construction Company: Lay the foundation for a successful future.

With 26 years of experience, MCG has delivered the quality, expertise, dedication and service to hundreds of construction projects in Ventura County, in Northern and Southern California, and in the continental US. Both buildings completed and the relationships developed in the process have become integrated with the fabric of their communities.

Our building specialties include the construction of Medical Buildings, Hospitals, Commercial Developments, Retirement Communities, Hospitality Buildings, Community Centers, Performing Arts Centers, Educational Facilities and Law Enforcement Buildings.